Case Study

Cannington Training Centre

  • Client

    EDF Energy

  • Sector area

    Private/education

  • Main contractor

    Kier Construction

  • Project

    Cannington Training Centre

  • Location

    South West, Bridgwater

  • Date

    June 2014 to January 2015

  • Description

    EDF Energy is creating a showcase residential training centre for its employees at Cannington Court, with 50 ensuite bedrooms plus pioneering technology and smart metering throughout. THE £15million conversion of the medieval priory into a national training centre includes an extension to Cannington Court for a reception, work on the Priory Barn, refurbishment of Priory Lodge and the dairy, and a building to replace the Amory Block, which will be demolished. Avonline Flooring is laying a specialist lime-based screed floor in the existing grade 1 building as well as throughout the redeveloped centre, and then laying carpet and vinyl in the new centre.

  • Finishes

    Carpet, vinyl, barrier Matting and White Rock wall cladding