Case Study

Olympic Village Development

  • Client

    Olympic Delivery Authority

  • Sector area

    Residential development

  • Main contractor

    Galliford Try

  • Project

    East Village development, former Athletes Village Olympic Park

  • Location

    South East - Stratford East London

  • Date

    February to November 2013

  • Description

    The East Village development was initially designed to provide thousands of bed spaces for athletes and officials
    during London 2012 Olympic and Paralympic Games. The refurbishment carried out for the Olympic Delivery Authority forms part of the retrofit of the Athletes’ Village into its legacy arrangement as the East Village. The development has been transformed into a residential neighbourhood with community facilities, new parks and open spaces. Two of the accommodation blocks – N26 and N13 – now provide 223 private, 115 social housing and 89 shared ownership homes.

    Over several months Avonline Flooring fitted 31,000m2 of flooring in 427 housing units in the two blocks.

  • Finishes

    Traditional fit carpet, wood and vinyl tiles